All Works Report¶
This report contains details of all works within PMS for a local authority.

A key part of this report is the “Before” and “After” columns (before have the suffix _b and after the suffix _a). This shows surface, PSCI, and IRI of the road surface before and after works were completed. It also shows the planned length and width of the works compared to what was actually carried out.
