Project Interventions

../../../_images/intervention_logic.png

Notes

  • Treatment Type and Intervention Type default to None if can’t be calculated.

  • If the Surface Course has not been set then the calculated Intervention Type may appear to be incorrect. In the example below the Intervention Type is set to Surface Restoration as it is an Overlay of 150mm thickness:

../../../_images/works_grid_example_1.png
  • If the Construction Method for the lane(s) has been set to None then no Pavement layers will be available

../../../_images/works_grid_example_2.png
  • Construction method is At Grade but the thickness is not 0, then the Intervention Type will be set to None (as it is invalid).

../../../_images/works_grid_example_3.png