Project Validation Tab¶
The Project Validation Tab will display information regarding the project that is being created by the user. There are three types of icons that can display here under warning level.

This icon indicates the Project Parameters are valid

This icon indicates the parameter has an issue but won’t block the project from being submitted and completed.

This icon indicates the parameter is an Error and will block the project from being submitted and completed.
The description of each warning level will be given next to the icon itself. These descriptions will indicate to the user what needs to edited in order for the project to be saved.
The gif below will give a brief demo on creating the project and how to work through some of the errors as they arise.

Validation Descriptions¶
Warning Messages¶
No existing surface material has been recorded
Pre-Works PSCI Survey not complete
Post-Works PSCI Survey not complete
Surveyed PSCI rating is greater than or equal to 7 (Strengthening)
Local road unit cost too high (> €4.50)
Regional road unit cost too high (> €5.50)
Surveyed PSCI rating is less than or equal to 6 (Resealing)
Input Actual project cost
Not all funding sources are accounted for (actual)
Not all funding sources are accounted for (estimated)
Pavement Condition Validation not satisfied
Only resealing is permitted on Restoration Maintenance Programmes
Have DoT approved SMA >60km/hr?
Asphalt Concrete surface course not permitted >60km/hr
Regional and Local Road Project contains National Road Segments
National Road Project contains Regional or Local Road Segments
Contractor name is missing in one or more Works Section Details
Error Messages¶
The year is outside the valid range
Input Estimated project cost
Works Sections Total Length does not match Project Total Length
One or more Works Sections have invalid length of 0
Only High Friction Surfacing can be used for the Treatment Course if other Pavement Layers are selected
The Works Grid requires a Surfaces Course
Notes¶
Relating to the validation error “Contractor name is missing in one or more Works Section Details” - if any Works Section Details have ‘Works By’ set to Contractor and Contractor name is missing - then a warning appears, at any stage in the project lifecycle.